Work On Bridge To Take Several Months

Tex-Dot says work on the damaged San Jacinto River Bridge on I-10will take a few months

to repair. The bridge was damaged when barges broke loose during Tropical Storm Imelda

and struck the bridge. Traffic has been shifted to the eastbound side. Work could take as

long as March before the bridge is fully reopened.


View Full Site