Breach In Detention Pond

KLVI News

Drainage District 6 has advised the Green Pond Gulley 5800 acre Detention Pond near Gilbert

Lake Estates a 30 foot wide by 2 foot breach that is spilling water. If there is a full break it would

send a 2 foot wall of water towards Gilbert Lake Estate and Interstate 10. The water would cause

additional extreme levels of water in Taylor’s Bayou.


Sponsored Content

Sponsored Content